top of page

Kenora Console

1-Day Build
2025

Our guest bedroom needed a narrow dresser unit, I had family visiting in a few days, some scrap (and very warped) birch plywood, and a CNC. 


If you don't include drying time, this was a 1-day build from design to completion.

  • ~30min measuring and digital design

  • ~1 hour digital CNC prep

  • ~1 hour CNC cutting 

  • ~2 hours sanding and cleaning edges

  • ~1.5 hour finishing with water-based poly

  • ~1 hour rattan install on sliding doors

  • ~1 hour assembly and glue up

I know exposed edge plywood furniture isnt everyones cup of tea, and ya, there are things I would have done differently had I spent more time in the design phase, but theres something so endearing about quick and loose projects. You learn a lot, you have fun doing it, it's quick satisfaction, and you solve a problem.

Build
Relevant Projects
bottom of page